Warning: Cannot assign an empty string to a string offset in /home/customer/www/naseembukhari.com/public_html/wp-content/themes/kepler/kepler-wp/header.php on line 76
PAKISTAN | MIDDLE EAST |

WELL COMPLETION EQUIPMENT

  • Wellhead Control Panels (WHCP)
  • Completion Packers
  • Downhole Safety Valves (DHSV, Sub-Surface Safety Shutdown Valves (SSSV))

Wellhead & X-Mas Tree

  • Casing Head Assemblies
  • Tubing Spools
  • Tubing Head Assemblies
  • Tubing Head Adapters
  • Tubing Hangers
  • Casing Hangers
  • Pack-off (Isolation) Seals
  • Wear Bushings/ Bowl Protectors
  • Test Plugs
  • Mudline Suspension Systems
  • API 6A Valves, Chokes & Flanges
  • Seals & Gaskets

Casing Accessories (Cementing & Float Equipment)

  • Float Shoes
  • Float Collars
  • Cementing Plugs
  • Cement Retainers
  • Stage Cementing Equipment
  • Inner String Cementing Equipment
  • Casing Centralizers
  • Stop Collars
  • Bridge Plugs
  • Setting Tools